01 June 2014

Sides on. Anchor well. Frame stiffeners.



 Temporary timber frame erected the night before for hoisting up the sides.
The timber came from the pellets for the aluminium.


 Stem bar going in.

 Decided to fit the anchor well frame before fitting the sides.


 Lug for a d shackle for the end of the anchor rope.




 Fitting frame stiffeners.



 First side going up.





 Tacked at the rear and slowly working forward.






 One side done.

 Starting port side



 Every thing is lining up correctly.



 Sides on!!













No comments:

Post a Comment